{"id":7566,"date":"2026-04-09T17:33:16","date_gmt":"2026-04-09T16:33:16","guid":{"rendered":"https:\/\/nsbi.org.rs\/?p=7566"},"modified":"2026-04-23T12:34:34","modified_gmt":"2026-04-23T11:34:34","slug":"rani-javni-uvid-za-elaborat-pgr-a-blokova-oko-betanije","status":"publish","type":"post","link":"https:\/\/nsbi.org.rs\/sr\/rani-javni-uvid-za-elaborat-pgr-a-blokova-oko-betanije","title":{"rendered":"Rani javni uvid za Elaborat PGR-a blokova oko Betanije"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">JP &#8220;Urbanizam&#8221; Novi Sad objavilo je Elaborat Plana generalne regulacije (PGR) blokova izme\u0111u ulica Novosadskog sajma, Mi\u010durinove, Bulevara kralja Petra I i Ulice Branimira \u0106osi\u0107a u Novom Sadu. Pove\u0107ana spratnost vi\u0161eporodi\u010dnih objekata, izgradnja vi\u0161eporodi\u010dnih objekata na mestima jednoporodi\u010dnih ali i ru\u0161enje biv\u0161e fabrike DES samo su neke od nepovoljnih planova koji se predvi\u0111aju u ovim blokovima.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Na mestima ku\u0107a dolaze zgrade<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Na mestima dosada\u0161njih jednoporodi\u010dnih stambenih ku\u0107a planiraju se vi\u0161eporodi\u010dni stambeni objekti razli\u010dite spratnosti.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">U Ulicama Bogdana Garabantina, Slobodana Baji\u0107a i Majevi\u010dkoj planiraju se objekti srednjeg intenziteta, spratnosti od P+2+Pk do P+4+Pk, dok se uz Bulevar kralja Petra I planiraju op\u0161tegradski i linijski centri spratnosti P+5+Pk.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Me\u0111utim, iako se u Mile\u0161evskoj i delu Trga 1. maja planira zadr\u017eavanje jednospratnih jednoporodi\u010dnih ku\u0107a, u Mile\u0161evskoj ulici ve\u0107 sada mo\u017eemo videti 2-3 aktivna gradili\u0161ta na kojima se grade vi\u0161espratni vi\u0161eporodi\u010dni objekti, te se postavlja pitanje na koji na\u010din se urbanisti\u010dki planovi odre\u0111uju i kako se izdaju dozvole za objekte mimo urbanisti\u010dkih planova.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Industrijsko nasle\u0111e grada odlazi u istoriju<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Iako fabrika DES vi\u0161e ne radi, zemlji\u0161te se u Katastru vodi na Republiku Srbiju, \u0161to zna\u010di da je jo\u0161 uvek u javnoj svojini dr\u017eave. Urbanisti planiraju ru\u0161enje fabrike, prodaju parcela i objekte vi\u0161eporodi\u010dnog stanovanja spratnosti do P+4+Pk (prizemlje, 4 sprata, potkrovlje), dok se iza objekata planira linijski park. Ovakvim planom jasno je da \u0107e objekti vi\u0161eporodi\u010dnog stanovanja dovesti do ve\u0107e naseljenosti i ve\u0107ih saobra\u0107ajnih gu\u017evi, a linijski par \u0107e biti u totalnom mraku, zaklonjen okolnim visokim objektima.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No, jo\u0161 ve\u0107i problem predstavlja i uni\u0161tavanje industrijskog nasle\u0111a Novog Sada. Umesto o\u010duvanja objekata i kompleksa fabrike DES, njihove obnove i nove funkcije kompleksa kao \u0161to su dru\u0161tveno-kulturni centri ili NVO centri, urbanisti planiraju rasprodaju parcela i vi\u0161eporodi\u010dne stambene objekte.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"990\" height=\"510\" data-src=\"https:\/\/nsbi.org.rs\/wp-content\/uploads\/2026\/04\/image-990x510.png\" alt=\"\" class=\"wp-image-7567 lazyload\" data-srcset=\"https:\/\/nsbi.org.rs\/wp-content\/uploads\/2026\/04\/image-990x510.png 990w, https:\/\/nsbi.org.rs\/wp-content\/uploads\/2026\/04\/image-768x395.png 768w, https:\/\/nsbi.org.rs\/wp-content\/uploads\/2026\/04\/image.png 1278w\" data-sizes=\"(max-width: 990px) 100vw, 990px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 990px; --smush-placeholder-aspect-ratio: 990\/510;\" \/><figcaption class=\"wp-element-caption\">Na mestu fabrike DES planiraju se vi\u0161eporodi\u010dni objekti spratnosti P+2+Pk do P+4+Pk.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Rani javni uvid i primedbe na plan<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Rani javni uvid traje do 24. aprila, a gra\u0111ani, stru\u010dnjaci, udru\u017eenja i sva zainteresovana javnost mo\u017ee poslati primedbe i komentare na ovaj plan na mejl Gradske uprave za urbanizam i gra\u0111evinske poslove: <strong><a href=\"mailto:urbanizam@uprava.novisad.rs\"><\/a><a href=\"mailto:urbanizam@uprava.novisad.rs\">urbanizam@uprava.novisad.rs<\/a><\/strong> a detalje o ranom javnom uvidu mo\u017ee\u0161 prona\u0107i na sajtu <strong><a href=\"https:\/\/www.nsurbanizam.rs\/?q=rani_javni_uvid\">JP &#8220;Urbanizam&#8221; Novi Sad<\/a><\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Primedbe koje je na\u0161e udru\u017eenje uputilo na ovaj plan pogledaj <strong><a href=\"https:\/\/dopisi.nsbi.org.rs\/dopisi\/09750346-9baf-4b9e-a667-00d4346edb59\">na ovom linku<\/a><\/strong>. <\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\">Podr\u017eite na\u0161 rad<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Svaka donacija poma\u017ee nam u zagovaranju boljih re\u0161enja, edukaciji i stvaranju boljeg biciklsiti\u010dkog Novog Sada, grada ugodnijeg za \u017eivot. I ne zaboravi, bicikliranje je lek za du\u0161u.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img decoding=\"async\" width=\"250\" height=\"250\" data-src=\"https:\/\/nsbi.org.rs\/wp-content\/uploads\/2026\/04\/NBSIPSQR.png\" alt=\"\" class=\"wp-image-7614 lazyload\" data-srcset=\"https:\/\/nsbi.org.rs\/wp-content\/uploads\/2026\/04\/NBSIPSQR.png 250w, https:\/\/nsbi.org.rs\/wp-content\/uploads\/2026\/04\/NBSIPSQR-150x150.png 150w\" data-sizes=\"(max-width: 250px) 100vw, 250px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 250px; --smush-placeholder-aspect-ratio: 250\/250;\" \/><\/figure>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>JP &#8220;Urbanizam&#8221; Novi Sad objavilo je Elaborat Plana generalne regulacije (PGR) blokova izme\u0111u ulica Novosadskog sajma, Mi\u010durinove, Bulevara kralja Petra I i Ulice Branimira \u0106osi\u0107a u Novom Sadu. Pove\u0107ana spratnost&#8230;<\/p>\n","protected":false},"author":12,"featured_media":7569,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[13],"tags":[204,372,463],"class_list":["post-7566","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-novosti","tag-urbanizam","tag-saobracaj","tag-betanija"],"acf":[],"uagb_featured_image_src":{"full":["https:\/\/nsbi.org.rs\/wp-content\/uploads\/2026\/04\/URB-plan-za-Betaniju.jpg",1920,1080,false],"thumbnail":["https:\/\/nsbi.org.rs\/wp-content\/uploads\/2026\/04\/URB-plan-za-Betaniju-150x150.jpg",150,150,true],"medium":["https:\/\/nsbi.org.rs\/wp-content\/uploads\/2026\/04\/URB-plan-za-Betaniju-768x432.jpg",768,432,true],"medium_large":["https:\/\/nsbi.org.rs\/wp-content\/uploads\/2026\/04\/URB-plan-za-Betaniju-768x432.jpg",640,360,true],"large":["https:\/\/nsbi.org.rs\/wp-content\/uploads\/2026\/04\/URB-plan-za-Betaniju-990x557.jpg",640,360,true],"1536x1536":["https:\/\/nsbi.org.rs\/wp-content\/uploads\/2026\/04\/URB-plan-za-Betaniju-1536x864.jpg",1536,864,true],"2048x2048":["https:\/\/nsbi.org.rs\/wp-content\/uploads\/2026\/04\/URB-plan-za-Betaniju.jpg",1920,1080,false]},"uagb_author_info":{"display_name":"NSBI Redakcija","author_link":"https:\/\/nsbi.org.rs\/sr\/author\/redakcija"},"uagb_comment_info":0,"uagb_excerpt":"JP &#8220;Urbanizam&#8221; Novi Sad objavilo je Elaborat Plana generalne regulacije (PGR) blokova izme\u0111u ulica Novosadskog sajma, Mi\u010durinove, Bulevara kralja Petra I i Ulice Branimira \u0106osi\u0107a u Novom Sadu. Pove\u0107ana spratnost...","_links":{"self":[{"href":"https:\/\/nsbi.org.rs\/sr\/wp-json\/wp\/v2\/posts\/7566","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nsbi.org.rs\/sr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nsbi.org.rs\/sr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nsbi.org.rs\/sr\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/nsbi.org.rs\/sr\/wp-json\/wp\/v2\/comments?post=7566"}],"version-history":[{"count":6,"href":"https:\/\/nsbi.org.rs\/sr\/wp-json\/wp\/v2\/posts\/7566\/revisions"}],"predecessor-version":[{"id":7695,"href":"https:\/\/nsbi.org.rs\/sr\/wp-json\/wp\/v2\/posts\/7566\/revisions\/7695"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nsbi.org.rs\/sr\/wp-json\/wp\/v2\/media\/7569"}],"wp:attachment":[{"href":"https:\/\/nsbi.org.rs\/sr\/wp-json\/wp\/v2\/media?parent=7566"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nsbi.org.rs\/sr\/wp-json\/wp\/v2\/categories?post=7566"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nsbi.org.rs\/sr\/wp-json\/wp\/v2\/tags?post=7566"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}